Sunday, June 26, 2016

Responsible Problem Management


Our present approach to producing products tends to limit the amount of information needed by those potentially affected by the products to adequately avoid waste and other adverse impacts. This can be traced to how businesses treat problems.

Some problems are known (identifiable and understood) and can be fixed based on experience and a basic learning curve; while others, or parts of others, are unknown along with how they can be fixed. A problem is typically identified by the differences between observations and expectations, which is the function of testing. Understanding the problem is more challenging because it involves finding the causes of those differences (troubleshooting). Testing and troubleshooting together are considered a task that is often performed by a person or team, just as fixing the problem can be considered a task performed by a person or team.

Both "finding" and "fixing" tasks are often performed simultaneously, resulting in some fraction of the overall problem being fixed over a given time. Fixing the problem stops when its total cost exceeds either the available resources or the cost of living with what's left to fix. This economic approach to fixing problems has the important downside that the finding task is also stopped, which limits knowledge about how much is really left to fix and makes its assessment more of a guess.

Some simple modeling using basic learning curves shows that, as a rule of thumb, the effort required to find and fix a practically unknown problem is three times the effort required to fix an entirely known problem, assuming that each task uses the same number of people and everyone performing those tasks has at least average preparation and proficiency. If guessing is unavoidable, then prudent planning would include this margin. If knowledge about the minimum effort is unavailable, then we can assume (also as a rule of thumb) that it will be ten times the effort that an ideal team under ideal conditions would need to expend.

In my experience, most of the "find" task is typically done during research and development, before large-scale production of a product is even attempted. Most potential problems are identified and fixed during redesign of the product. Also, it is common to complete only up to 80% of the find task prior to production, which my modeling suggests is the result of a plan to use the minimum effort for both finding and fixing (instead of just fixing).

The 20% difference in quality may or may not be found by customers, whose feedback could be incorporated into future "products" along with new features that justify them paying more. This is a way of masking and evading twice the acknowledged economic cost (whose largest component is essentially effort). The physical cost still exists, however; and can become much larger when the product is used in a dependent relationship with other products and conditions that are combined in a system. If a system's performance degradation becomes large enough due to multiple problems that haven't been totally fixed, then an additional cost may be added to fix it, some of which is indirectly due to deficiencies in an individual product and is thus passed along to the customer of the product.

One way that a producer can ensure keeping their own cost down is to define product performance to only include what they choose to totally fix. The success of this strategy depends on knowing what that is before they set expectations for the product with their customers, and having a way to deflect responsibility for the consequences of what they missed. This may be one reason that businesses try to eliminate government oversight in the form of inspections and regulations beyond what they explicitly promise to their customers, because accountability for consequences of what they missed could force the cost back on them.

Application of the precautionary principle would also force the cost on the producers, by making them assess the impact of their products on people and environments where the products might be used, and not deploying products where any of those impacts are negative. A major argument against this is the stifling of innovation which might result in advantages over existing products, an argument that is implicitly built into biological evolution, a process of creating "products" (species) that die out if they don't provide an advantage to procreation.

Since the main test of products is their continuing sale to customers, and sales can't be made if customers die before they buy, it might make better sense to ensure that full investigations of problems and potential problems are conducted, either by businesses or agencies of the public, and the the results released to everyone for evaluation. The investigations and release of results would continue as the conditions, environments, and underlying understandings change beyond those originally considered.

Key to enabling evaluation would be development of truly universal and quality education that includes unbiased access to basic knowledge, understanding, and skills, along with experience in the investigation of products over a wide range of types. If the complexity of products exceeds the ability to adequately investigate and evaluate them, then people would become less likely to accept them and they would ultimately be discontinued.



Tuesday, July 21, 2015

Error and Complexity

The learning curve model that I developed based on observations of how fast tasks are performed has yielded another valuable insight. The difference between expected performance of a task and actual performance over time, will tend to spike and then fall off gradually, which is likely to confound typically linear (and often overly-optimistic) approaches to scheduling its completion. Furthermore, the timing and amount of the spike will vary with the complexity of the task, which may not even be explicitly factored into expectations. The math shows that the timing and amount of this spike in what could be considered "error" is theoretically predictable.

In "Units of Completion," I suggested that the complexity of a task could be assessed in terms of a number of units that are simultaneously performed during the task, and which define how closely we can measure its completion. I've taken this another step, by using the concept of a unit to identify the highest meaningful efficiency that could be used to establish ideal expectations.

For example, if my task is to edit a page with 500 words, then the highest completion I could reliably measure is 499 words (500 minus one), which is 499/500 or 99.8% of the total. That fraction is also the highest meaningful efficiency, which translates into an expectation of editing 499 words in the best-case time. With average editing ability, I would have an efficiency of 50% instead of 99.8%; so during the best-case time, I will have only edited 50% of the total, or 250 words. If I'm responsible for meeting a schedule based on 99.8% efficiency, at the end of the best-case time I will be behind by 249 words (499 minus 250), or 49.8%, which is my error at that time, and it will take nine times that long to reach zero error. A manager tracking my progress up to the best-case time would see an even worse picture, because my error would reach a peak of 67% when I was at just 40% of the best-case time. Ideally, of course, the manager should plan for the actual time to achieve zero error, and not care what happens until then.

Editing ten pages instead of one could be treated as a single task, and the same fractions would simply apply to the larger number of words, with the minimum allowable error at the end now being ten words instead of one. If, however, this error was still kept at one word, then the highest completion (and the highest meaningful efficiency) would increase to 99.98% (or 4999/5000 words) and have significant side-effects which might together be considered a major degradation in performance. For one, the manager would now need to allow more than 12 times the new best-case time (which accounts for all ten pages) for me to reach zero error. My maximum error would increase to nearly 74%, occurring at 32% of the best-case time; and at the best-case time, my error would be slightly higher, at 50.0%.

My actual efficiency in editing pages is higher than the average, more like 70% than 50%, which would decrease the time and value of the maximum error, as well as the amount of time to reach zero error in each case. There would still appear to be a degrading effect on performance as the complexity increased (for example, the maximum error would have increased from 54% to 62%), and that could still raise an unnecessary "red flag" by a manager who was looking too closely and didn't expect it.

The real world is certainly messier than this theoretical discussion might imply. As I described in "Units of Completion," a lot depends on whether the task you think you're evaluating is one of these idealized pure tasks, a parallel combination of pure tasks, or a sequence of pure tasks. Since my analysis is based on actual observations (as are the other models I've developed), the behaviors I've identified are potentially observable in actual situations, and are therefore subject to test. They suggest a reasonable set of explanations for what may be unresolved or even unrecognized issues in actual applications, which is why I've brought them up.

One such issue, which I alluded to and can foresee, is an increase in waste: wasted time, wasted effort, and wasted physical resources. For example, a coordinated "task" such as a major industrial or government project might be terminated because of commitment to unrealistic planning goals that could not be met, and the waste of discontinuing it would be added to the loss of opportunity for meeting the needs it was intended to address. Spikes in what I've called "error" might result in the waste of resources to correct problems that don't exist, which rings true as a consequence of too much complexity. If more realistic schedules are impractical, either because they demand resources that aren't available, or because of competition with others who do not acknowledge their necessity, then the gains of previous effort should be preserved as much as possible until a new and more effective task -- or set of tasks -- can be devised. If preservation cannot be done, waste seems inevitable, and the ultimate objectives of the task are too important to abandon, then cooperation (rather than competition) may be needed between multiple entities who can together address the impediments to success.